NEW TECNOLOGY WITH REMOTE CHEMICAL LOADING

Slåttland is proud to be part of the ground-breaking Remote Chemical Loading project delivered by TESS to the Yggdrasil field.

As a key contributor, Slåttland is responsible for engineering, fabrication, and testing across various Technology Readiness Levels (TRLs). This includes both in-house testing and close collaboration with the client to ensure quality and performance at every stage.

📸 The images showcase testing of the funnel and valve rack systems that will be installed on the Hugin platform – a vital step in developing the future of offshore chemical handling.

We are grateful for the opportunity to contribute to this exciting and forward-looking project, and we look forward to continued collaboration!

Read more about us here

TOGEHTER FOR THE BEST SOLUTION
Denne nettsiden bruker cookies

Vi bruker informasjonskapsler for å forbedre brukeropplevelsen på nettstedet vårt og for personlig tilpasning av annonser. Ved å fortsette å bruke dette nettstedet samtykker du til vår bruk av informasjonskapsler. Avvis alle cookies